Exhibition layout Dwg.
We tested the panels a few weeks beforehand to ensure a smooth installation with no surprises on the uneven back panels and curved wall. I worked with exhibitions assistant Ben who did a fantastic job installing the whole exhibition.
Split battens for hanging- 2 x per panel running the whole length of the wall.First 2 rows up - and the simple hanging system makes it quick and easy.
Applying the laser cut card panel cut outs to the top levels- it was high and the scissor lift was a wee bit wobbly! You can just see the plan layout for the panels to the left.
Up and down in the scissor lift.
View from floor above looking down on graphics being installed.
Last of the wall graphics being applied and getting the projection correctly positioned.
6pm Thursday 21st February 2104 and all ready!
Smiling but also concentrated faces and hand gestures at the preview show people were engaged and delighted by the feature wall and video works. Thanks to everyone for coming along!